Equinix SA1
Equinix · Seville
- IT live
- 6 MW
- Free to lease
- 0.8 MW
- $ / kW·mo
- $118
- White space
- 34k ft²
Inventory
86% occupiedPower
6 MWlive
0.8 MW to lease · 5.2 MW in use
White space
34k ft²total
4,773 ft² free · 29k ft² occupied
3,167 m² · 443 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 1.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$118/kW·mo
12.2¢ industrial · 16.1¢ after PUE 1.32
- Per MW·year
- $1.4M
- This site · 6 MW
- $8.5M/yr
- 12 kW rack
- $1,411/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.2M/yr less.
Spain industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 70%
- Rack density
- 12 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- Local grid plus Equinix on-site generators, N+1.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
0.91 L/kWh
fleet avg · 2025 · 48k m³/yr at 6 MW
Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.
Equinix Cooling as a Service: CDU-fed direct-to-chip loops for high-density AI cabinets, alongside IDEC/CRAH for standard interconnection cages.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Seville, Andalusia, Spain
Seville, Spain
37.389°, -5.984° · Europe
Tenants / users
Networks, cloud, enterprise, finance — Equinix Fabric
Notes
SA1 is an Equinix IBX in the Seville metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.