Equinix MX2
Equinix · Mexico City
- IT live
- 14 MW
- Free to lease
- 1.7 MW
- $ / kW·mo
- $96
- White space
- 80k ft²
Inventory
88% occupiedPower
14 MWlive
1.7 MW to lease · 12.3 MW in use
White space
80k ft²total
9,545 ft² free · 70k ft² occupied
7,390 m² · 887 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 4.2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$96/kW·mo
10¢ industrial · 13.2¢ after PUE 1.32
- Per MW·year
- $1.2M
- This site · 14 MW
- $16M/yr
- 12 kW rack
- $1,156/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.
Mexico industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 70%
- Rack density
- 12 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- Local grid plus Equinix on-site generators, N+1.
Cooling
Plant
Evaporative
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
1.41 L/kWh
evaporative fleet · 2025 · 173k m³/yr at 14 MW
Operator average for evaporative halls, applied here — not a meter on this site. Equinix 2025 Sustainability Report.
Equinix Cooling as a Service: CDU-fed direct-to-chip loops for high-density AI cabinets, alongside IDEC/CRAH for standard interconnection cages.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
El Marqués, Querétaro, Mexico
El Marqués, Querétaro
20.590°, -100.388° · North America
Tenants / users
Networks, cloud, enterprise, finance — Equinix Fabric
Notes
MX2 is an Equinix IBX in the Mexico City metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.