Equinix MU4
Equinix · Munich
- IT live
- 14 MW
- Free to lease
- 1.4 MW
- $ / kW·mo
- $179
- White space
- 80k ft²
Inventory
90% occupiedPower
14 MWlive
1.4 MW to lease · 12.6 MW in use
White space
80k ft²total
7,954 ft² free · 72k ft² occupied
7,390 m² · 739 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 4.2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$179/kW·mo
18.6¢ industrial · 24.6¢ after PUE 1.32
- Per MW·year
- $2.2M
- This site · 14 MW
- $30M/yr
- 12 kW rack
- $2,151/mo
5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $25M/yr less.
Germany industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 96%
- Rack density
- 12 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- Mainova / German grid plus Equinix PPAs.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
0.91 L/kWh
fleet avg · 2025 · 112k m³/yr at 14 MW
Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.
Equinix Cooling as a Service: CDU-fed direct-to-chip loops for high-density AI cabinets, alongside IDEC/CRAH for standard interconnection cages.
Network carriers
8On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Aschheim, Bavaria, Germany
Aschheim, Bavaria
48.171°, 11.716° · Europe
Tenants / users
Networks, cloud, enterprise, finance — Equinix Fabric
Notes
MU4 is an Equinix IBX in the Munich metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.