Equinix MN3
Equinix · Manila
- IT live
- 10 MW
- Free to lease
- 1.2 MW
- $ / kW·mo
- $121
- White space
- 57k ft²
Inventory
88% occupiedPower
10 MWlive
1.2 MW to lease · 8.8 MW in use
White space
57k ft²total
6,818 ft² free · 50k ft² occupied
5,279 m² · 633 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$121/kW·mo
12.6¢ industrial · 16.6¢ after PUE 1.32
- Per MW·year
- $1.5M
- This site · 10 MW
- $15M/yr
- 12 kW rack
- $1,457/mo
3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.
Meralco · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 30%
- Rack density
- 12 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- Local grid plus Equinix on-site generators, N+1.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
12 kW
H100-eq
—
WUE
0.91 L/kWh
fleet avg · 2025 · 80k m³/yr at 10 MW
Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.
Chilled-water CRAH. Tropical wet-bulb limits liquid deployments; high-density cabinets offered where water and power allow.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Manila, Metro Manila, Philippines
Manila, Philippines
14.608°, 120.992° · Asia
Tenants / users
Networks, cloud, enterprise, finance — Equinix Fabric
Notes
MN3 is an Equinix IBX in the Manila metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.