Operational
Colocation
Air cooled
Tier III

Equinix LD8

Equinix · London Docklands

IT live
16 MW
Free to lease
1.4 MW
$ / kW·mo
$110
White space
133k ft²

Inventory

91% occupied

Power

16 MWlive

1.4 MW to lease · 14.6 MW in use

White space

133k ft²total

12k ft² free · 121k ft² occupied

12k m² · 1,115 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live16 MW
Free to lease1.4 MW
Utility feed20 MW
Campus / planned20 MW

About 4 MW of the utility feed is cooling, conversion, and house load.

Power cost

$110/kW·mo

10.8¢ industrial · 15.1¢ after PUE 1.40

Per MW·year
$1.3M
This site · 16 MW
$21M/yr
5 kW rack
$552/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

Hydro One / London · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2010
Renewable match
90%
Rack density
5 kW
Voltage
PUE
1.401.00 ideal · 1.60 typical
Power source
UK Power Networks plus Equinix PPAs.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

5 kW

H100-eq

—

WUE

0.91 L/kWh

fleet avg · 2025 · 128k m³/yr at 16 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.

Chilled-water CRAH. Campus offers Equinix Cooling as a Service for high-density cabinets.

Network carriers

9

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

6

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

London, England, United Kingdom

Docklands, London

51.508°, 0.003° · Europe

Tenants / users

Networks, finance, cloud

Notes

Docklands interconnection hub. LINX and Equinix IX adjacency.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.