Equinix KA1
Equinix · Kamloops
- IT live
- 4 MW
- Free to lease
- 0.5 MW
- $ / kW·mo
- $64
- White space
- 33k ft²
Inventory
87% occupiedPower
4 MWlive
0.5 MW to lease · 3.5 MW in use
White space
33k ft²total
4,333 ft² free · 29k ft² occupied
3,097 m² · 403 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 1.2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$64/kW·mo
6.4¢ industrial · 8.8¢ after PUE 1.37
- Per MW·year
- $768k
- This site · 4 MW
- $3.1M/yr
- 5 kW rack
- $320/mo
2.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.5M/yr less.
BC Hydro interior · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2015
- Renewable match
- 96%
- Rack density
- 5 kW
- PUE
- 1.371.00 ideal · 1.60 typical
- Power source
- BC Hydro. Dual feeds plus on-site diesel. Hydro-heavy British Columbia grid.
Cooling
Plant
Evaporative
Liquid
Not deployed
Rack density
5 kW
H100-eq
—
WUE
1.41 L/kWh
evaporative fleet · 2025 · 49k m³/yr at 4 MW
Operator average for evaporative halls, applied here — not a meter on this site. Equinix 2025 Sustainability Report.
IDEC / chilled-water CRAH, N+1. Campus Cooling as a Service is available for high-density cabinets on request.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Kamloops, British Columbia, Canada
Kamloops, BC
50.675°, -120.327° · North America
Tenants / users
Networks, cloud, enterprise, finance — Equinix Fabric
Notes
KA1 is an Equinix IBX in the Kamloops metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.