Equinix DB1
Equinix · Dublin
- IT live
- 10 MW
- Free to lease
- 0.8 MW
- $ / kW·mo
- $180
- White space
- 83k ft²
Inventory
92% occupiedPower
10 MWlive
0.8 MW to lease · 9.2 MW in use
White space
83k ft²total
6,667 ft² free · 77k ft² occupied
7,742 m² · 619 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$180/kW·mo
17.4¢ industrial · 24.7¢ after PUE 1.42
- Per MW·year
- $2.2M
- This site · 10 MW
- $22M/yr
- 5 kW rack
- $902/mo
5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $18M/yr less.
Ireland industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2010
- Renewable match
- 70%
- Rack density
- 5 kW
- PUE
- 1.421.00 ideal · 1.60 typical
- Power source
- EirGrid plus wind PPAs.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
5 kW
H100-eq
—
WUE
0.91 L/kWh
fleet avg · 2025 · 80k m³/yr at 10 MW
Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.
IDEC / chilled-water CRAH, N+1. Campus Cooling as a Service is available for high-density cabinets on request.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Dublin, Leinster, Ireland
Citywest, Dublin
53.287°, -6.424° · Europe
Tenants / users
Networks, cloud, enterprise, finance — Equinix Fabric
Notes
DB1 is an Equinix IBX in the Dublin metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.