Operational
Colocation
Liquid cooling
Tier III

Equinix BA2

Equinix · Barcelona

IT live
10 MW
Free to lease
1.4 MW
$ / kW·mo
$121
White space
57k ft²

Inventory

86% occupied

Power

10 MWlive

1.4 MW to lease · 8.6 MW in use

White space

57k ft²total

7,955 ft² free · 49k ft² occupied

5,279 m² · 739 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.4 MW
Utility feed13 MW
Campus / planned10 MW

About 3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$121/kW·mo

12.6¢ industrial · 16.6¢ after PUE 1.32

Per MW·year
$1.5M
This site · 10 MW
$15M/yr
12 kW rack
$1,457/mo
3.2¢ cheapdear 22.4¢

3.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $11M/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
70%
Rack density
12 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Local grid plus Equinix on-site generators, N+1.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

0.91 L/kWh

fleet avg · 2025 · 80k m³/yr at 10 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.

Equinix Cooling as a Service: CDU-fed direct-to-chip loops for high-density AI cabinets, alongside IDEC/CRAH for standard interconnection cages.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

6

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Barcelona, Catalonia, Spain

Barcelona, Spain

41.388°, 2.170° · Europe

Tenants / users

Networks, cloud, enterprise, finance — Equinix Fabric

Notes

BA2 is an Equinix IBX in the Barcelona metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.