Equinix AM11
Equinix · Amsterdam

- IT live
- 24 MW
- Free to lease
- 2.4 MW
- $ / kW·mo
- $145
- White space
- 75k ft²
Inventory
90% occupiedPower
24 MWlive
2.4 MW to lease · 21.6 MW in use
White space
75k ft²total
7,500 ft² free · 68k ft² occupied
6,968 m² · 697 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 7.2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$145/kW·mo
15¢ industrial · 19.8¢ after PUE 1.32
- Per MW·year
- $1.7M
- This site · 24 MW
- $42M/yr
- 30 kW rack
- $4,336/mo
4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $33M/yr less.
Netherlands industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2022
- Renewable match
- 96%
- Rack density
- 30 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- TenneT / Dutch grid plus wind contracts.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
0.91 L/kWh
fleet avg · 2025 · 191k m³/yr at 24 MW
Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.
Equinix Cooling as a Service: CDU-fed direct-to-chip loops for high-density AI cabinets, alongside IDEC/CRAH for standard interconnection cages.
Network carriers
8On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Amsterdam, North Holland, Netherlands
Amsterdam
52.397°, 4.852° · Europe
Tenants / users
Networks, cloud, enterprise, finance — Equinix Fabric
Notes
AM11 is an Equinix IBX in the Amsterdam metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.