Equinix AM10
Equinix · Amsterdam
- Planned IT
- 36 MW
- Free to lease
- 36 MW
- $ / kW·mo
- $146
- White space
- 150k ft²
Inventory
0% occupiedPower
36 MWlive
36 MW to lease · 0 MW in use
White space
150k ft²total
150k ft² free · — occupied
14k m² · 14k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$146/kW·mo
15.6¢ industrial · 20¢ after PUE 1.28
- Per MW·year
- $1.7M
- This site · 36 MW
- $63M/yr
- 20 kW rack
- $2,915/mo
4.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $50M/yr less.
Amsterdam metro / Liander 50 kV · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2029
- Renewable match
- 100%
- Rack density
- 20 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
0.91 L/kWh
fleet avg · 2025 · 287k m³/yr at 36 MW
Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
11On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Amsterdam, North Holland, Netherlands
Amsterdam Zuidoost (planned IBX)
52.319°, 4.954° · Europe
Tenants / users
Networks, cloud, hyperscale — Equinix Fabric
Notes
Second planned Amsterdam IBX. Pair to AM9. Completes Equinix's published Amsterdam pipeline.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.