Equinix AE1
Equinix · Adelaide
- IT live
- 6 MW
- Free to lease
- 0.7 MW
- $ / kW·mo
- $134
- White space
- 50k ft²
Inventory
88% occupiedPower
6 MWlive
0.7 MW to lease · 5.3 MW in use
White space
50k ft²total
6,000 ft² free · 44k ft² occupied
4,645 m² · 557 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 1.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$134/kW·mo
13.4¢ industrial · 18.4¢ after PUE 1.37
- Per MW·year
- $1.6M
- This site · 6 MW
- $9.6M/yr
- 5 kW rack
- $670/mo
4.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.3M/yr less.
NEM industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2015
- Renewable match
- 70%
- Rack density
- 5 kW
- PUE
- 1.371.00 ideal · 1.60 typical
- Power source
- Local DNSP plus Equinix renewable contracts.
Cooling
Plant
Evaporative
Liquid
Not deployed
Rack density
5 kW
H100-eq
—
WUE
1.41 L/kWh
evaporative fleet · 2025 · 74k m³/yr at 6 MW
Operator average for evaporative halls, applied here — not a meter on this site. Equinix 2025 Sustainability Report.
IDEC / chilled-water CRAH, N+1. Campus Cooling as a Service is available for high-density cabinets on request.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Adelaide, South Australia, Australia
Adelaide, SA
-34.928°, 138.601° · Oceania
Tenants / users
Networks, cloud, enterprise, finance — Equinix Fabric
Notes
AE1 is an Equinix IBX in the Adelaide metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.