Enovum MTL1 Côte-des-Neiges
Enovum (WhiteFiber) · Bedford
- IT live
- 8 MW
- Remaining
- 8 MW
- $ / kW·mo
- $41
- White space
- 50k ft²
Inventory
50% occupiedPower
16 MWcampus
8 MW to commission · 8 MW in use
White space
100k ft²total
50k ft² free · 50k ft² occupied
9,290 m² · 4,645 m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 12 MW of the utility feed is cooling, conversion, and house load.
Power cost
$41/kW·mo
5¢ industrial · 5.6¢ after PUE 1.12
- Per MW·year
- $491k
- This site · 8 MW
- $3.9M/yr
- 40 kW rack
- $1,635/mo
1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.4M/yr less.
Hydro-Québec Rate L · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 99%
- Rack density
- 40 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
40 kW
H100-eq
2k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Montréal, Quebec, Canada
3195 Chemin Bedford, Montréal, QC H3S 1G3
45.500°, -73.629° · North America
Tenants / users
GPU cloud, WhiteFiber, AI colo
Notes
WhiteFiber / Enovum GPU hall. Hydro-Québec. High-density liquid in a mid-city Montréal building. Not a carrier hotel.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.