Planned
Colocation
Liquid cooling
Tier III

Eni / Khazna AI Campus

Eni / Khazna · Ferrera Erbognone

Planned IT
500 MW
Free to lease
500 MW
$ / kW·mo
$154
White space
1M ft²

Inventory

0% occupied

Power

500 MWlive

500 MW to lease · 0 MW in use

White space

1M ft²total

1M ft² free · occupied

97k m² · 97k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease500 MW
Utility feed
Campus / planned500 MW

Power cost

$154/kW·mo

18.8¢ industrial · 21.1¢ after PUE 1.12

Per MW·year
$1.8M
This site · 500 MW
$922M/yr
50 kW rack
$7,685/mo
3.2¢ cheapdear 22.4¢

5.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $765M/yr less.

Italy industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2029
Renewable match
80%
Rack density
50 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

50 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ferrera Erbognone, Lombardy, Italy

Ferrera Erbognone AI campus, Pavia

45.098°, 8.868° · Europe

Tenants / users

Hyperscale, AI pipeline

Notes

Joint Eni-Khazna campus next to the Green Data Center. Up to 500 MW IT. Storage and Ravenna CCS synergy discussed. Permitting, not live capacity.

Operator site