Eni / Khazna AI Campus
Eni / Khazna · Ferrera Erbognone
- Planned IT
- 500 MW
- Free to lease
- 500 MW
- $ / kW·mo
- $154
- White space
- 1M ft²
Inventory
0% occupiedPower
500 MWlive
500 MW to lease · 0 MW in use
White space
1M ft²total
1M ft² free · — occupied
97k m² · 97k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$154/kW·mo
18.8¢ industrial · 21.1¢ after PUE 1.12
- Per MW·year
- $1.8M
- This site · 500 MW
- $922M/yr
- 50 kW rack
- $7,685/mo
5.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $765M/yr less.
Italy industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2029
- Renewable match
- 80%
- Rack density
- 50 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
50 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ferrera Erbognone, Lombardy, Italy
Ferrera Erbognone AI campus, Pavia
45.098°, 8.868° · Europe
Tenants / users
Hyperscale, AI pipeline
Notes
Joint Eni-Khazna campus next to the Green Data Center. Up to 500 MW IT. Storage and Ravenna CCS synergy discussed. Permitting, not live capacity.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.