Eni Green Data Center
Eni · Ferrera Erbognone
- IT live
- 25 MW
- Remaining
- 15 MW
- $ / kW·mo
- $159
- White space
- 125k ft²
Inventory
63% occupiedPower
40 MWcampus
15 MW to commission · 25 MW in use
White space
200k ft²total
75k ft² free · 125k ft² occupied
19k m² · 6,968 m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 25 MW of the utility feed is cooling, conversion, and house load.
Power cost
$159/kW·mo
18.8¢ industrial · 21.8¢ after PUE 1.16
- Per MW·year
- $1.9M
- This site · 25 MW
- $48M/yr
- 40 kW rack
- $6,368/mo
5.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $40M/yr less.
Italy industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2013
- Renewable match
- 70%
- Rack density
- 40 kW
- PUE
- 1.161.00 ideal · 1.60 typical
- Power source
- Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Closed-loop direct-to-chip on HPC6/HPC7. About 96 percent of processor heat rejected to liquid. Green500-class.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ferrera Erbognone, Lombardy, Italy
Ferrera Erbognone, Pavia
45.096°, 8.866° · Europe
Tenants / users
Eni HPC6 / HPC7
Notes
Captive industrial supercomputing. HPC6 plus HPC7 together cross exascale. First Italian hall built as a green data center; 1 MW on-site PV. Not multi-tenant colo.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.