Operational
Colocation
Air cooled
Tier III

Emtel / CEB Data Centre

Emtel · Port Louis

IT live
4 MW
Free to lease
0.5 MW
$ / kW·mo
$141
White space
31k ft²

Inventory

88% occupied

Power

4 MWlive

0.5 MW to lease · 3.5 MW in use

White space

31k ft²total

3,750 ft² free · 28k ft² occupied

2,903 m² · 348 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live4 MW
Free to lease0.5 MW
Utility feed7.5 MW
Campus / planned6 MW

About 3.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$141/kW·mo

14.6¢ industrial · 19.3¢ after PUE 1.32

Per MW·year
$1.7M
This site · 4 MW
$6.8M/yr
6 kW rack
$844/mo
3.2¢ cheapdear 22.4¢

4.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.3M/yr less.

CEB · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
20%
Rack density
6 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
National grid plus on-site generators. N+1 ride-through.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

2

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Port Louis, Port Louis, Mauritius

Port Louis, Mauritius

-20.161°, 57.501° · Africa

Tenants / users

Enterprise, finance, subsea, government

Notes

Mauritius colo next to SAFE / METISS / 2Africa landings. Indian Ocean hub.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.