Emtel / CEB Data Centre
Emtel · Port Louis
- IT live
- 4 MW
- Free to lease
- 0.5 MW
- $ / kW·mo
- $141
- White space
- 31k ft²
Inventory
88% occupiedPower
4 MWlive
0.5 MW to lease · 3.5 MW in use
White space
31k ft²total
3,750 ft² free · 28k ft² occupied
2,903 m² · 348 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 3.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$141/kW·mo
14.6¢ industrial · 19.3¢ after PUE 1.32
- Per MW·year
- $1.7M
- This site · 4 MW
- $6.8M/yr
- 6 kW rack
- $844/mo
4.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.3M/yr less.
CEB · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2014
- Renewable match
- 20%
- Rack density
- 6 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- National grid plus on-site generators. N+1 ride-through.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
6 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
2Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Port Louis, Port Louis, Mauritius
Port Louis, Mauritius
-20.161°, 57.501° · Africa
Tenants / users
Enterprise, finance, subsea, government
Notes
Mauritius colo next to SAFE / METISS / 2Africa landings. Indian Ocean hub.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.