Operational
Colocation
Air cooled
Tier III

Elea SPO3 Tamboré

Elea Data Centers · Tamboré

IT live
10 MW
Free to lease
1.6 MW
$ / kW·mo
$101
White space
87k ft²

Inventory

84% occupied

Power

10 MWlive

1.6 MW to lease · 8.4 MW in use

White space

87k ft²total

11k ft² free · 76k ft² occupied

8,065 m² · 1,032 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.6 MW
Utility feed12.5 MW
Campus / planned10 MW

About 2.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$101/kW·mo

10.8¢ industrial · 13.8¢ after PUE 1.28

Per MW·year
$1.2M
This site · 10 MW
$12M/yr
8 kW rack
$807/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.5M/yr less.

Enel SP · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
80%
Rack density
8 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Enel SP / CPFL. Dual feeds plus on-site diesel. Hydro-heavy Brazilian grid.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Tropical wet-bulb; evaporative hours limited. High-density cabinets where water and power allow.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Barueri, São Paulo, Brazil

Tamboré, Barueri, Greater São Paulo

-23.512°, -46.849° · South America

Tenants / users

Enterprise, cloud

Notes

Ex-DXC hall acquired 2024. Puts Elea next to Scala Tamboré and Equinix SP2/SP4 in the Barueri cluster.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.