Elea SPO3 Tamboré
Elea Data Centers · Tamboré
- IT live
- 10 MW
- Free to lease
- 1.6 MW
- $ / kW·mo
- $101
- White space
- 87k ft²
Inventory
84% occupiedPower
10 MWlive
1.6 MW to lease · 8.4 MW in use
White space
87k ft²total
11k ft² free · 76k ft² occupied
8,065 m² · 1,032 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 2.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$101/kW·mo
10.8¢ industrial · 13.8¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 10 MW
- $12M/yr
- 8 kW rack
- $807/mo
3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.5M/yr less.
Enel SP · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2016
- Renewable match
- 80%
- Rack density
- 8 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Enel SP / CPFL. Dual feeds plus on-site diesel. Hydro-heavy Brazilian grid.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Tropical wet-bulb; evaporative hours limited. High-density cabinets where water and power allow.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Barueri, São Paulo, Brazil
Tamboré, Barueri, Greater São Paulo
-23.512°, -46.849° · South America
Tenants / users
Enterprise, cloud
Notes
Ex-DXC hall acquired 2024. Puts Elea next to Scala Tamboré and Equinix SP2/SP4 in the Barueri cluster.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.