Under construction
Colocation
Liquid cooling
Tier III

Elea SPO2 São Bernardo

Elea Data Centers · São Bernardo

Planned IT
100 MW
Free to lease
100 MW
$ / kW·mo
$101
White space
313k ft²

Inventory

0% occupied

Power

100 MWlive

100 MW to lease · 0 MW in use

White space

313k ft²total

313k ft² free · — occupied

29k m² · 29k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease100 MW
Utility feed—
Campus / planned100 MW

Power cost

$101/kW·mo

10.8¢ industrial · 13.8¢ after PUE 1.28

Per MW·year
$1.2M
This site · 100 MW
$121M/yr
30 kW rack
$3,027/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $85M/yr less.

Enel SP · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
80%
Rack density
30 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Enel SP / CPFL. Dual feeds plus on-site diesel. Hydro-heavy Brazilian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

São Bernardo do Campo, São Paulo, Brazil

Av. Marginal Direita Anchieta 1241, Jordanópolis, São Bernardo do Campo

-23.694°, -46.565° · South America

Tenants / users

Hyperscale, AI, cloud

Notes

100 MW sustainable cloud and AI hub on the Anchieta corridor. Elea's São Paulo scale-up next to the 1.5 GW Rio AI City pipeline.

Operator site