Elea SPO2 São Bernardo
Elea Data Centers · São Bernardo
- Planned IT
- 100 MW
- Free to lease
- 100 MW
- $ / kW·mo
- $101
- White space
- 313k ft²
Inventory
0% occupiedPower
100 MWlive
100 MW to lease · 0 MW in use
White space
313k ft²total
313k ft² free · — occupied
29k m² · 29k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$101/kW·mo
10.8¢ industrial · 13.8¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 100 MW
- $121M/yr
- 30 kW rack
- $3,027/mo
3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $85M/yr less.
Enel SP · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 80%
- Rack density
- 30 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Enel SP / CPFL. Dual feeds plus on-site diesel. Hydro-heavy Brazilian grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
São Bernardo do Campo, São Paulo, Brazil
Av. Marginal Direita Anchieta 1241, Jordanópolis, São Bernardo do Campo
-23.694°, -46.565° · South America
Tenants / users
Hyperscale, AI, cloud
Notes
100 MW sustainable cloud and AI hub on the Anchieta corridor. Elea's São Paulo scale-up next to the 1.5 GW Rio AI City pipeline.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.