Elea SPO1
Elea Data Centers · São Paulo
- IT live
- 8 MW
- Free to lease
- 1.3 MW
- $ / kW·mo
- $101
- White space
- 78k ft²
Inventory
84% occupiedPower
8 MWlive
1.3 MW to lease · 6.7 MW in use
White space
78k ft²total
10k ft² free · 68k ft² occupied
7,258 m² · 929 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 2 MW of the utility feed is cooling, conversion, and house load.
Power cost
$101/kW·mo
10.8¢ industrial · 13.8¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 8 MW
- $9.7M/yr
- 6 kW rack
- $605/mo
3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.8M/yr less.
Enel SP · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2012
- Renewable match
- 80%
- Rack density
- 6 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Enel SP / CPFL. Dual feeds plus on-site diesel. Hydro-heavy Brazilian grid.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
6 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Tropical wet-bulb; evaporative hours limited. High-density cabinets where water and power allow.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
São Paulo, São Paulo, Brazil
São Paulo (ex-Oi hall)
-23.550°, -46.640° · South America
Tenants / users
Enterprise, government, cloud
Notes
Acquired from Oi in 2021. Elea's original São Paulo interconnection. Complements SPO2 São Bernardo and the Rio AI City campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.