Elea Rio AI City
Elea Data Centers · Rio AI City
- IT live
- 40 MW
- Free to lease
- 1.0 GW
- $ / kW·mo
- $91
- White space
- 100k ft²
Inventory
0% occupiedPower
40 MWlive
1.0 GW to lease · 0 MW in use
White space
100k ft²total
2.6M ft² free · — occupied
9,290 m² · 239k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 1.8 GW of the utility feed is cooling, conversion, and house load.
Power cost
$91/kW·mo
10.4¢ industrial · 12.5¢ after PUE 1.20
- Per MW·year
- $1.1M
- This site · 40 MW
- $44M/yr
- 40 kW rack
- $3,644/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $30M/yr less.
Light · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 80%
- Rack density
- 40 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- Light / Brazilian grid plus PPAs.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
RJO1 operational; RJO2 from 2026. Campus targeting 1.5 GW with liquid-ready AI halls.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rio de Janeiro, Rio de Janeiro, Brazil
Rio de Janeiro, Brazil
-22.910°, -43.250° · South America
Tenants / users
Hyperscale, AI
Notes
Elea's Rio AI City. First-phase live; multi-GW end-state is pipeline.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.