Elea Rio AI City

Elea Data Centers · Rio AI City

IT live
40 MW
Free to lease
1.0 GW
$ / kW·mo
$91
White space
100k ft²

Inventory

0% occupied

Power

40 MWlive

1.0 GW to lease · 0 MW in use

White space

100k ft²total

2.6M ft² free · occupied

9,290 m² · 239k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live40 MW
Free to lease1.0 GW
Utility feed1.9 GW
Campus / planned1.5 GW

About 1.8 GW of the utility feed is cooling, conversion, and house load.

Power cost

$91/kW·mo

10.4¢ industrial · 12.5¢ after PUE 1.20

Per MW·year
$1.1M
This site · 40 MW
$44M/yr
40 kW rack
$3,644/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $30M/yr less.

Light · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
80%
Rack density
40 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
Light / Brazilian grid plus PPAs.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

RJO1 operational; RJO2 from 2026. Campus targeting 1.5 GW with liquid-ready AI halls.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Rio de Janeiro, Rio de Janeiro, Brazil

Rio de Janeiro, Brazil

-22.910°, -43.250° · South America

Tenants / users

Hyperscale, AI

Notes

Elea's Rio AI City. First-phase live; multi-GW end-state is pipeline.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.