Elea BEL1 Belém
Elea Data Centers · Belém
- Planned IT
- 100 MW
- Free to lease
- 100 MW
- $ / kW·mo
- $82
- White space
- 357k ft²
Inventory
0% occupiedPower
100 MWlive
100 MW to lease · 0 MW in use
White space
357k ft²total
357k ft² free · — occupied
33k m² · 33k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$82/kW·mo
8.8¢ industrial · 11.3¢ after PUE 1.28
- Per MW·year
- $987k
- This site · 100 MW
- $99M/yr
- 25 kW rack
- $2,056/mo
2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $63M/yr less.
Equatorial Pará · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2031
- Renewable match
- 85%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Equatorial Pará. Dual feeds. Amazon-adjacent grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Belém, Pará, Brazil
Belém, Pará
-1.456°, -48.490° · South America
Tenants / users
Amazon AI / hyperscale pipeline
Notes
First 100 MW Amazon AI data center tracked in northern Brazil. Permitting and site prep. North/Northeast ReData incentive zone.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.