Edged Merlin Lisbon AI Campus
Merlin Properties / Edged · Lisbon AI Campus
- Planned IT
- 180 MW
- Free to lease
- 144 MW
- $ / kW·mo
- $102
- White space
- 450k ft²
Inventory
20% occupiedPower
180 MWlive
144 MW to lease · 36 MW in use
White space
450k ft²total
360k ft² free · 90k ft² occupied
42k m² · 33k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$102/kW·mo
11.6¢ industrial · 13.9¢ after PUE 1.20
- Per MW·year
- $1.2M
- This site · 180 MW
- $219M/yr
- 40 kW rack
- $4,065/mo
3.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $159M/yr less.
Portugal industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 80%
- Rack density
- 40 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- REN plus Merlin renewable contracts.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
AI-ready liquid manifolds. Construction started October 2024.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Lisbon, Lisbon, Portugal
Greater Lisbon, Portugal
38.722°, -9.139° · Europe
Tenants / users
Hyperscale, AI colo
Notes
180 MW AI campus near Lisbon. Second-largest Portuguese pipeline project after Start Campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.