Under construction
Colocation
Liquid cooling
Tier III

EdgeConneX Warsaw 4

EdgeConneX · Warsaw

Planned IT
65 MW
Free to lease
65 MW
$ / kW·mo
$116
White space
203k ft²

Inventory

0% occupied

Power

65 MWlive

65 MW to lease · 0 MW in use

White space

203k ft²total

203k ft² free · occupied

19k m² · 19k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease65 MW
Utility feed
Campus / planned65 MW

Power cost

$116/kW·mo

12¢ industrial · 15.8¢ after PUE 1.32

Per MW·year
$1.4M
This site · 65 MW
$90M/yr
30 kW rack
$3,469/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $66M/yr less.

PGE / TGE · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
35%
Rack density
30 kW
PUE
1.321.00 ideal · 1.60 typical
Power source
PGE / PSE. Dual 15 kV inlets plus on-site diesel. Coal-to-wind Polish grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Warsaw, Mazovia, Poland

Warsaw

52.184°, 21.052° · Europe

Tenants / users

Hyperscale, cloud

Notes

65 MW hall targeted Q4 2026. EdgeConneX already has WAW1-WAW3 live. One of the largest single Warsaw builds this cycle.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.