EdgeConneX Warsaw 4
EdgeConneX · Warsaw
- Planned IT
- 65 MW
- Free to lease
- 65 MW
- $ / kW·mo
- $116
- White space
- 203k ft²
Inventory
0% occupiedPower
65 MWlive
65 MW to lease · 0 MW in use
White space
203k ft²total
203k ft² free · — occupied
19k m² · 19k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$116/kW·mo
12¢ industrial · 15.8¢ after PUE 1.32
- Per MW·year
- $1.4M
- This site · 65 MW
- $90M/yr
- 30 kW rack
- $3,469/mo
3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $66M/yr less.
PGE / TGE · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2026
- Renewable match
- 35%
- Rack density
- 30 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- PGE / PSE. Dual 15 kV inlets plus on-site diesel. Coal-to-wind Polish grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Warsaw, Mazovia, Poland
Warsaw
52.184°, 21.052° · Europe
Tenants / users
Hyperscale, cloud
Notes
65 MW hall targeted Q4 2026. EdgeConneX already has WAW1-WAW3 live. One of the largest single Warsaw builds this cycle.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.