Under construction
Colocation
Liquid cooling
Tier III

EdgeConneX Queretaro

EdgeConneX · QRO

Planned IT
48 MW
Free to lease
48 MW
$ / kW·mo
$89
White space
171k ft²

Inventory

0% occupied

Power

48 MWlive

48 MW to lease · 0 MW in use

White space

171k ft²total

171k ft² free · occupied

16k m² · 16k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease48 MW
Utility feed
Campus / planned48 MW

Power cost

$89/kW·mo

9.8¢ industrial · 12.3¢ after PUE 1.25

Per MW·year
$1.1M
This site · 48 MW
$52M/yr
25 kW rack
$2,236/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $35M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
30%
Rack density
25 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Queretaro

20.575°, -100.372° · North America

Tenants / users

Hyperscale, cloud

Notes

EdgeConneX first Mexico campus. US wholesale platform following CloudHQ and the hyperscalers into Queretaro. Construction.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.