Under construction
Colocation
Liquid cooling
Tier III

EdgeConneX Milan

EdgeConneX · Milan

Planned IT
40 MW
Free to lease
40 MW
$ / kW·mo
$174
White space
143k ft²

Inventory

0% occupied

Power

40 MWlive

40 MW to lease · 0 MW in use

White space

143k ft²total

143k ft² free · occupied

13k m² · 13k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease40 MW
Utility feed
Campus / planned40 MW

Power cost

$174/kW·mo

18.6¢ industrial · 23.8¢ after PUE 1.28

Per MW·year
$2.1M
This site · 40 MW
$83M/yr
25 kW rack
$4,345/mo
3.2¢ cheapdear 22.4¢

5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $69M/yr less.

Italy industrial / Milan · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
50%
Rack density
25 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Milan, Lombardy, Italy

Greater Milan

45.521°, 9.092° · Europe

Tenants / users

Hyperscale, cloud, content

Notes

EQT Infrastructure wholesale. First EdgeConneX Italy campus. Content and cloud on-ramps, not a Caldera carrier hotel.

Operator site