EdgeConneX AMS05
EdgeConneX · Schiphol-Rijk EdgeConneX
- IT live
- 40 MW
- Free to lease
- 3.6 MW
- $ / kW·mo
- $142
- White space
- 208k ft²
Inventory
91% occupiedPower
40 MWlive
3.6 MW to lease · 36.4 MW in use
White space
208k ft²total
15k ft² free · 193k ft² occupied
19k m² · 1,394 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 10 MW of the utility feed is cooling, conversion, and house load.
Power cost
$142/kW·mo
15.2¢ industrial · 19.5¢ after PUE 1.28
- Per MW·year
- $1.7M
- This site · 40 MW
- $68M/yr
- 20 kW rack
- $2,841/mo
4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $54M/yr less.
Schiphol-Rijk / Liander · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 100%
- Rack density
- 20 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
11On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Schiphol-Rijk, North Holland, Netherlands
Koolhovenlaan 6, 1119 NE Schiphol-Rijk
52.287°, 4.767° · Europe
Tenants / users
Hyperscale BTS, AI wholesale
Notes
18,116 sqm build-to-suit. Up to 40 MW N+1. Fifth hall on the campus EdgeConneX power-banked past 100 MW / 44,000 sqm.