Under construction
Colocation
Liquid cooling
Tier III

EcoDataCenter Borlänge

EcoDataCenter · Kvarsveden

Planned IT
250 MW
Free to lease
250 MW
$ / kW·mo
$42
White space
625k ft²

Inventory

0% occupied

Power

250 MWlive

250 MW to lease · 0 MW in use

White space

625k ft²total

625k ft² free · occupied

58k m² · 58k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease250 MW
Utility feed
Campus / planned250 MW

Power cost

$42/kW·mo

industrial · 5.8¢ after PUE 1.15

Per MW·year
$504k
This site · 250 MW
$126M/yr
40 kW rack
$1,679/mo
3.2¢ cheapdear 22.4¢

1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $45M/yr less.

Sweden SE2 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
100%
Rack density
40 kW
PUE
1.151.00 ideal · 1.60 typical
Power source
Svenska kraftnät / Vattenfall. Dual feeds. Hydro-nuclear Swedish grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Borlänge, Dalarna, Sweden

Kvarsveden, Borlänge

60.486°, 15.437° · Europe

Tenants / users

Hyperscale, AI training

Notes

AI mega campus next to Falun. Two halls under construction. Largest EcoDataCenter build. SE2 hydro.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.