EcoDataCenter Borlänge
EcoDataCenter · Kvarsveden
- Planned IT
- 250 MW
- Free to lease
- 250 MW
- $ / kW·mo
- $42
- White space
- 625k ft²
Inventory
0% occupiedPower
250 MWlive
250 MW to lease · 0 MW in use
White space
625k ft²total
625k ft² free · — occupied
58k m² · 58k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$42/kW·mo
5¢ industrial · 5.8¢ after PUE 1.15
- Per MW·year
- $504k
- This site · 250 MW
- $126M/yr
- 40 kW rack
- $1,679/mo
1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $45M/yr less.
Sweden SE2 · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 100%
- Rack density
- 40 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Svenska kraftnät / Vattenfall. Dual feeds. Hydro-nuclear Swedish grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Borlänge, Dalarna, Sweden
Kvarsveden, Borlänge
60.486°, 15.437° · Europe
Tenants / users
Hyperscale, AI training
Notes
AI mega campus next to Falun. Two halls under construction. Largest EcoDataCenter build. SE2 hydro.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.