Eclairion Bruyères-le-Châtel
Eclairion · Bruyères-le-Châtel
- IT live
- 40 MW
- Free to lease
- 4.4 MW
- $ / kW·mo
- $97
- White space
- 188k ft²
Inventory
89% occupiedPower
40 MWlive
4.4 MW to lease · 35.6 MW in use
White space
188k ft²total
11k ft² free · 177k ft² occupied
17k m² · 1,022 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 35 MW of the utility feed is cooling, conversion, and house load.
Power cost
$97/kW·mo
10.4¢ industrial · 13.3¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 40 MW
- $47M/yr
- 40 kW rack
- $3,887/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $32M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 95%
- Rack density
- 40 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
40 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Bruyères-le-Châtel, Île-de-France, France
Parc du château, Bruyères-le-Châtel, Essonne
48.591°, 2.191° · Europe
Tenants / users
Mistral AI, French sovereign AI, HPC colo
Notes
First European supercomputer-colo campus. Four 2,500 sqm platforms; Mistral occupies two. 40 MW Enedis now, 60 MW RTE by 2027. Container GPU halls, not a carrier hotel.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.