Under construction
Colocation
Liquid cooling
Tier III

Digital Realty Rome Trigoria

Digital Realty / Interxion · Trigoria

Planned IT
30 MW
Free to lease
30 MW
$ / kW·mo
$172
White space
144k ft²

Inventory

0% occupied

Power

30 MWlive

30 MW to lease · 0 MW in use

White space

144k ft²total

144k ft² free · — occupied

13k m² · 13k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live—
Free to lease30 MW
Utility feed—
Campus / planned30 MW

Power cost

$172/kW·mo

18.4¢ industrial · 23.6¢ after PUE 1.28

Per MW·year
$2.1M
This site · 30 MW
$62M/yr
16 kW rack
$2,751/mo
3.2¢ cheapdear 22.4¢

5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $51M/yr less.

Italy industrial / Rome · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
50%
Rack density
16 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

16 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Rome, Lazio, Italy

Trigoria, 22 ha campus, Rome

41.779°, 12.478° · Europe

Tenants / users

Cloud, government, Maghreb/East-Med interconnection

Notes

Greenfield 22 ha Rome campus. First 3 MW IT targeted early 2027. Distinct from Interxion ROM1 already in the index. Pair to Abbiategrasso for a two-metro Italian platform.

Operator site