Digital Realty Rome Trigoria
Digital Realty / Interxion · Trigoria
- Planned IT
- 30 MW
- Free to lease
- 30 MW
- $ / kW·mo
- $172
- White space
- 144k ft²
Inventory
0% occupiedPower
30 MWlive
30 MW to lease · 0 MW in use
White space
144k ft²total
144k ft² free · — occupied
13k m² · 13k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$172/kW·mo
18.4¢ industrial · 23.6¢ after PUE 1.28
- Per MW·year
- $2.1M
- This site · 30 MW
- $62M/yr
- 16 kW rack
- $2,751/mo
5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $51M/yr less.
Italy industrial / Rome · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 50%
- Rack density
- 16 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
16 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rome, Lazio, Italy
Trigoria, 22 ha campus, Rome
41.779°, 12.478° · Europe
Tenants / users
Cloud, government, Maghreb/East-Med interconnection
Notes
Greenfield 22 ha Rome campus. First 3 MW IT targeted early 2027. Distinct from Interxion ROM1 already in the index. Pair to Abbiategrasso for a two-metro Italian platform.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.