Digital Realty PAR11

Digital Realty / Interxion · Paris

IT live
26 MW
Free to lease
7.1 MW
$ / kW·mo
$99
White space
108k ft²

Inventory

73% occupied

Power

26 MWlive

7.1 MW to lease · 18.9 MW in use

White space

108k ft²total

29k ft² free · 79k ft² occupied

10k m² · 2,733 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live26 MW
Free to lease7.1 MW
Utility feed40 MW
Campus / planned32 MW

About 14 MW of the utility feed is cooling, conversion, and house load.

Power cost

$99/kW·mo

10.4¢ industrial · 13.5¢ after PUE 1.30

Per MW·year
$1.2M
This site · 26 MW
$31M/yr
20 kW rack
$1,974/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $21M/yr less.

France Enedis · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
60%
Rack density
20 kW
Voltage
PUE
1.301.00 ideal · 1.60 typical
Power source
RTE / Enedis. Dual feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

0.59 L/kWh

fleet avg · 2025 · 134k m³/yr at 26 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Digital Realty 2025 Impact Report.

Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Paris, Île-de-France, France

Paris metro

48.920°, 2.230° · Europe

Tenants / users

Hyperscale, AI, cloud

Notes

Newest Interxion Paris hall. Liquid-ready.