Digital Realty MRS6 Bouc-Bel-Air
Digital Realty / Interxion · Bouc-Bel-Air
- Planned IT
- 50 MW
- Free to lease
- 50 MW
- $ / kW·mo
- $99
- White space
- 179k ft²
Inventory
0% occupiedPower
50 MWlive
50 MW to lease · 0 MW in use
White space
179k ft²total
179k ft² free · — occupied
17k m² · 17k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$99/kW·mo
10.6¢ industrial · 13.6¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 50 MW
- $59M/yr
- 25 kW rack
- $2,476/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $41M/yr less.
France Enedis / Marseille · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 100%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Bouc-Bel-Air, Provence-Alpes-Côte d'Azur, France
Bouc-Bel-Air, Bouches-du-Rhône
43.455°, 5.415° · Europe
Tenants / users
Hyperscale, AI pipeline
Notes
50 MW AI-ready conversion of a 26,000 sqm warehouse. 225 kV RTE. Seven halls. Construction from 2026, delivery 2028. Complements the port MRS campus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.