Digital Realty MRS3
Digital Realty / Interxion · Marseille
- IT live
- 16 MW
- Free to lease
- 6.0 MW
- $ / kW·mo
- $101
- White space
- 91k ft²
Inventory
63% occupiedPower
16 MWlive
6.0 MW to lease · 10.0 MW in use
White space
91k ft²total
34k ft² free · 57k ft² occupied
8,446 m² · 3,146 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 11.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$101/kW·mo
10.6¢ industrial · 13.8¢ after PUE 1.30
- Per MW·year
- $1.2M
- This site · 16 MW
- $19M/yr
- 12 kW rack
- $1,207/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.
France Enedis · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 60%
- Rack density
- 12 kW
- PUE
- 1.301.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual feeds.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
0.59 L/kWh
fleet avg · 2025 · 83k m³/yr at 16 MW
Operator fleet average applied to this hall — not a site meter. Digital Realty 2025 Impact Report.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
2On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Marseille, Provence-Alpes-Côte d'Azur, France
Marseille, France
43.310°, 5.380° · Europe
Tenants / users
Cloud, subsea, content, hyperscale
Notes
Third Marseille Interxion building.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.