Expanding
Colocation
Liquid cooling
Tier III

Digital Realty MRS3

Digital Realty / Interxion · Marseille

IT live
16 MW
Free to lease
6.0 MW
$ / kW·mo
$101
White space
91k ft²

Inventory

63% occupied

Power

16 MWlive

6.0 MW to lease · 10.0 MW in use

White space

91k ft²total

34k ft² free · 57k ft² occupied

8,446 m² · 3,146 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live16 MW
Free to lease6.0 MW
Utility feed27.5 MW
Campus / planned22 MW

About 11.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$101/kW·mo

10.6¢ industrial · 13.8¢ after PUE 1.30

Per MW·year
$1.2M
This site · 16 MW
$19M/yr
12 kW rack
$1,207/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.

France Enedis · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
60%
Rack density
12 kW
Voltage
PUE
1.301.00 ideal · 1.60 typical
Power source
RTE / Enedis. Dual feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

0.59 L/kWh

fleet avg · 2025 · 83k m³/yr at 16 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Digital Realty 2025 Impact Report.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

2

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Marseille, Provence-Alpes-Côte d'Azur, France

Marseille, France

43.310°, 5.380° · Europe

Tenants / users

Cloud, subsea, content, hyperscale

Notes

Third Marseille Interxion building.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.