Operational
Colocation
Air cooled
Tier III

Digital Realty IAD12

Digital Realty · Northern Virginia

IT live
48 MW
Free to lease
3.8 MW
$ / kW·mo
$75
White space
333k ft²

Inventory

92% occupied

Power

48 MWlive

3.8 MW to lease · 44.2 MW in use

White space

333k ft²total

27k ft² free · 307k ft² occupied

31k m² · 2,477 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live48 MW
Free to lease3.8 MW
Utility feed60 MW
Campus / planned60 MW

About 12 MW of the utility feed is cooling, conversion, and house load.

Power cost

$75/kW·mo

7.3¢ industrial · 10.2¢ after PUE 1.40

Per MW·year
$895k
This site · 48 MW
$43M/yr
8 kW rack
$597/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $24M/yr less.

Northern Virginia / Dominion · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2018
Renewable match
25%
Rack density
8 kW
PUE
1.401.00 ideal · 1.60 typical
Power source
Dominion Energy.

Cooling

Plant

Evaporative

Liquid

Not deployed

Rack density

8 kW

H100-eq

WUE

0.59 L/kWh

fleet avg · 2025 · 248k m³/yr at 48 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Digital Realty 2025 Impact Report.

Chilled-water CRAH, 2N electrical. Liquid-ready pods offered on adjacent Digital Realty Northern Virginia campuses.

Network carriers

9

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Ashburn, Virginia, United States

Ashburn, VA

39.012°, -77.478° · North America

Tenants / users

Cloud, network, enterprise

Notes

PlatformDIGITAL interconnection in the world's largest data center market.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.