Operational
Colocation
Air cooled
Tier III

Digital Realty GIG1 Rio

Digital Realty · Rio de Janeiro

IT live
10 MW
Free to lease
1.6 MW
$ / kW·mo
$99
White space
69k ft²

Inventory

84% occupied

Power

10 MWlive

1.6 MW to lease · 8.4 MW in use

White space

69k ft²total

11k ft² free · 58k ft² occupied

6,452 m² · 1,032 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.6 MW
Utility feed17.5 MW
Campus / planned14 MW

About 7.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$99/kW·mo

10.4¢ industrial · 13.5¢ after PUE 1.30

Per MW·year
$1.2M
This site · 10 MW
$12M/yr
8 kW rack
$790/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.2M/yr less.

Light · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
60%
Rack density
8 kW
PUE
1.301.00 ideal · 1.60 typical
Power source
Light / Brazilian grid.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

—

WUE

0.59 L/kWh

fleet avg · 2025 · 52k m³/yr at 10 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Digital Realty 2025 Impact Report.

Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.

Network carriers

1

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Rio de Janeiro, Rio de Janeiro, Brazil

Rio de Janeiro, Brazil

-22.910°, -43.170° · South America

Tenants / users

Cloud, enterprise, subsea

Notes

Rio campus. Complements Ascenty São Paulo / Vinhedo.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.