Digital Realty FRA20
Digital Realty / Interxion · Frankfurt
- IT live
- 28 MW
- Free to lease
- 8.1 MW
- $ / kW·mo
- $175
- White space
- 117k ft²
Inventory
71% occupiedPower
28 MWlive
8.1 MW to lease · 19.9 MW in use
White space
117k ft²total
34k ft² free · 83k ft² occupied
11k m² · 3,143 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 17 MW of the utility feed is cooling, conversion, and house load.
Power cost
$175/kW·mo
18.4¢ industrial · 23.9¢ after PUE 1.30
- Per MW·year
- $2.1M
- This site · 28 MW
- $59M/yr
- 20 kW rack
- $3,492/mo
5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $48M/yr less.
Germany industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 60%
- Rack density
- 20 kW
- PUE
- 1.301.00 ideal · 1.60 typical
- Power source
- Mainova / German grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
0.59 L/kWh
fleet avg · 2025 · 145k m³/yr at 28 MW
Operator fleet average applied to this hall — not a site meter. Digital Realty 2025 Impact Report.
Direct-to-chip cold plates and rear-door heat exchangers. Designed for GB200/Blackwell-class racks.
Network carriers
8On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Frankfurt, Hesse, Germany
Frankfurt am Main
50.128°, 8.750° · Europe
Tenants / users
Hyperscale, AI
Notes
Latest Interxion Frankfurt hall. Liquid-ready AI colo.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.