Operational
Colocation
Liquid cooling
Tier III

Digital Realty FRA17

Digital Realty / Interxion · Frankfurt

IT live
24 MW
Free to lease
2.2 MW
$ / kW·mo
$175
White space
120k ft²

Inventory

91% occupied

Power

24 MWlive

2.2 MW to lease · 21.8 MW in use

White space

120k ft²total

11k ft² free · 109k ft² occupied

11k m² · 1,003 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live24 MW
Free to lease2.2 MW
Utility feed30 MW
Campus / planned24 MW

About 6 MW of the utility feed is cooling, conversion, and house load.

Power cost

$175/kW·mo

18.4¢ industrial · 23.9¢ after PUE 1.30

Per MW·year
$2.1M
This site · 24 MW
$50M/yr
15 kW rack
$2,619/mo
3.2¢ cheapdear 22.4¢

5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $42M/yr less.

Germany industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
60%
Rack density
15 kW
Voltage
PUE
1.301.00 ideal · 1.60 typical
Power source
Mainova / German grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

15 kW

H100-eq

WUE

0.59 L/kWh

fleet avg · 2025 · 124k m³/yr at 24 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Digital Realty 2025 Impact Report.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

8

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Frankfurt, Hesse, Germany

Frankfurt am Main

50.125°, 8.745° · Europe

Tenants / users

Hyperscale, AI, cloud

Notes

Newer FRA numbered hall.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.