Operational
Colocation
Liquid cooling
Tier III

Digital Realty FRA13

Digital Realty / Interxion · Frankfurt

IT live
22 MW
Free to lease
2.0 MW
$ / kW·mo
$175
White space
125k ft²

Inventory

91% occupied

Power

22 MWlive

2.0 MW to lease · 20.0 MW in use

White space

125k ft²total

11k ft² free · 114k ft² occupied

12k m² · 1,045 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live22 MW
Free to lease2.0 MW
Utility feed27.5 MW
Campus / planned22 MW

About 5.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$175/kW·mo

18.4¢ industrial · 23.9¢ after PUE 1.30

Per MW·year
$2.1M
This site · 22 MW
$46M/yr
12 kW rack
$2,095/mo
3.2¢ cheapdear 22.4¢

5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $38M/yr less.

Germany industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
60%
Rack density
12 kW
Voltage
PUE
1.301.00 ideal · 1.60 typical
Power source
Mainova / German grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

0.59 L/kWh

fleet avg · 2025 · 114k m³/yr at 22 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Digital Realty 2025 Impact Report.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

8

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Frankfurt, Hesse, Germany

Frankfurt am Main

50.122°, 8.742° · Europe

Tenants / users

Hyperscale, cloud, finance

Notes

High-density FRA hall.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.