Operational
Colocation
Liquid cooling
Tier III

Digital Realty EWR22 Piscataway

Digital Realty · Piscataway

IT live
32 MW
Free to lease
3.8 MW
$ / kW·mo
$135
White space
182k ft²

Inventory

88% occupied

Power

32 MWlive

3.8 MW to lease · 28.2 MW in use

White space

182k ft²total

22k ft² free · 160k ft² occupied

17k m² · 2,027 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live32 MW
Free to lease3.8 MW
Utility feed40 MW
Campus / planned32 MW

About 8 MW of the utility feed is cooling, conversion, and house load.

Power cost

$135/kW·mo

14.2¢ industrial · 18.5¢ after PUE 1.30

Per MW·year
$1.6M
This site · 32 MW
$52M/yr
12 kW rack
$1,617/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $40M/yr less.

PSEG · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
60%
Rack density
12 kW
PUE
1.301.00 ideal · 1.60 typical
Power source
PSE&G / PJM.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

0.59 L/kWh

fleet avg · 2025 · 165k m³/yr at 32 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Digital Realty 2025 Impact Report.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

1

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Piscataway, New Jersey, United States

Piscataway, NJ

40.553°, -74.458° · North America

Tenants / users

Hyperscale, cloud

Notes

Second Piscataway building.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.