Operational
Colocation
Liquid cooling
Tier III

Digital Edge SEL1

Digital Edge · Seoul

IT live
14 MW
Free to lease
1.3 MW
$ / kW·mo
$104
White space
80k ft²

Inventory

91% occupied

Power

14 MWlive

1.3 MW to lease · 12.7 MW in use

White space

80k ft²total

7,159 ft² free · 72k ft² occupied

7,390 m² · 665 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live14 MW
Free to lease1.3 MW
Utility feed27.5 MW
Campus / planned22 MW

About 13.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$104/kW·mo

10.8¢ industrial · 14.3¢ after PUE 1.32

Per MW·year
$1.2M
This site · 14 MW
$17M/yr
12 kW rack
$1,249/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

KEPCO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
40%
Rack density
12 kW
PUE
1.321.00 ideal · 1.60 typical
Power source
KEPCO. Dual utility feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Seoul, Seoul, South Korea

Seoul, South Korea

37.500°, 126.890° · Asia

Tenants / users

Cloud, networks, enterprise

Notes

Digital Edge Seoul. APAC interconnection platform (Stonepeak).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.