Denvr Dataworks Calgary MSC1
Denvr Dataworks · Southeast Calgary
- IT live
- 5 MW
- Remaining
- 15 MW
- $ / kW·mo
- $60
- White space
- 63k ft²
Inventory
25% occupiedPower
20 MWcampus
15 MW to commission · 5 MW in use
White space
250k ft²total
188k ft² free · 63k ft² occupied
23k m² · 17k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 20 MW of the utility feed is cooling, conversion, and house load.
Power cost
$60/kW·mo
7.2¢ industrial · 8.3¢ after PUE 1.15
- Per MW·year
- $725k
- This site · 5 MW
- $3.6M/yr
- 40 kW rack
- $2,418/mo
2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2M/yr less.
Alberta AESO · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 30%
- Rack density
- 40 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- ENMAX / AESO. Dual feeds plus on-site diesel. Gas-marginal Alberta grid.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
40 kW
H100-eq
1k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Calgary, Alberta, Canada
Southeast Calgary, AB
50.984°, -113.978° · North America
Tenants / users
Denvr Cloud H100/A100/Gaudi, Canadian AI startups, researchers
Notes
Calgary-native GPU cloud. 1,024 H100 SXM5 on Quantum-2 InfiniBand (2024). NVIDIA Cloud Partner. Packs 1-5 MW clusters into tight halls rather than a gigawatt campus. Dual-site ambition toward ~1 GW of Alberta land options. Complements eStruxture CAL-3 CoreWeave without being colo.