Expanding
Colocation
Air cooled
Tier III

De Novo Kyiv

De Novo · Kyiv

IT live
6 MW
Free to lease
0.8 MW
$ / kW·mo
$146
White space
69k ft²

Inventory

86% occupied

Power

6 MWlive

0.8 MW to lease · 5.2 MW in use

White space

69k ft²total

5,833 ft² free · 64k ft² occupied

6,452 m² · 542 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live6 MW
Free to lease0.8 MW
Utility feed10 MW
Campus / planned8 MW

About 4 MW of the utility feed is cooling, conversion, and house load.

Power cost

$146/kW·mo

15.2¢ industrial · 20.1¢ after PUE 1.32

Per MW·year
$1.8M
This site · 6 MW
$11M/yr
8 kW rack
$1,172/mo
3.2¢ cheapdear 22.4¢

4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.3M/yr less.

Ukrenergo wartime · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2010
Renewable match
20%
Rack density
8 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Ukrenergo. Dual 10 kV plus on-site diesel. Wartime islanding and generator-backed halls.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Kyiv, Kyiv, Ukraine

Kyiv

50.450°, 30.523° · Europe

Tenants / users

Enterprise, government, cloud

Notes

Leading Ukrainian commercial colo and cloud. Wartime generator-backed operation. Still the Kyiv enterprise default.

Operator site