De Novo Kyiv
De Novo · Kyiv
- IT live
- 6 MW
- Free to lease
- 0.8 MW
- $ / kW·mo
- $146
- White space
- 69k ft²
Inventory
86% occupiedPower
6 MWlive
0.8 MW to lease · 5.2 MW in use
White space
69k ft²total
5,833 ft² free · 64k ft² occupied
6,452 m² · 542 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 4 MW of the utility feed is cooling, conversion, and house load.
Power cost
$146/kW·mo
15.2¢ industrial · 20.1¢ after PUE 1.32
- Per MW·year
- $1.8M
- This site · 6 MW
- $11M/yr
- 8 kW rack
- $1,172/mo
4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.3M/yr less.
Ukrenergo wartime · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2010
- Renewable match
- 20%
- Rack density
- 8 kW
- PUE
- 1.321.00 ideal · 1.60 typical
- Power source
- Ukrenergo. Dual 10 kV plus on-site diesel. Wartime islanding and generator-backed halls.
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
8 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Kyiv, Kyiv, Ukraine
Kyiv
50.450°, 30.523° · Europe
Tenants / users
Enterprise, government, cloud
Notes
Leading Ukrainian commercial colo and cloud. Wartime generator-backed operation. Still the Kyiv enterprise default.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.