DCI AKL02 Albany
DCI Data Centers · Albany
- IT live
- 10 MW
- Free to lease
- 1.2 MW
- $ / kW·mo
- $82
- White space
- 208k ft²
Inventory
88% occupiedPower
10 MWlive
1.2 MW to lease · 8.8 MW in use
White space
208k ft²total
5,000 ft² free · 203k ft² occupied
19k m² · 465 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 40 MW of the utility feed is cooling, conversion, and house load.
Power cost
$82/kW·mo
9.2¢ industrial · 11.2¢ after PUE 1.22
- Per MW·year
- $983k
- This site · 10 MW
- $9.8M/yr
- 20 kW rack
- $1,639/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.4M/yr less.
Vector / NZAS-linked · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 85%
- Rack density
- 20 kW
- PUE
- 1.221.00 ideal · 1.60 typical
- Power source
- Vector / Transpower. Dual feeds plus on-site generators. ~85 percent renewable NZ grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Auckland, Auckland, New Zealand
297 Albany Highway, Rosedale, Auckland
-36.745°, 174.711° · Oceania
Tenants / users
Hyperscale, cloud, wholesale
Notes
7 ha Albany campus. Stage 1 complete 2025: 10 MW halls, 5 MW fitted. Designed for 40 MW. Brookfield platform.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.