Operational
Colocation
Air cooled
Tier III

Datum Fareham

Datum Datacentres · Fareham

IT live
6 MW
Free to lease
0.6 MW
$ / kW·mo
$168
White space
38k ft²

Inventory

90% occupied

Power

6 MWlive

0.6 MW to lease · 5.4 MW in use

White space

38k ft²total

3,750 ft² free · 34k ft² occupied

3,484 m² · 348 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live6 MW
Free to lease0.6 MW
Utility feed12.5 MW
Campus / planned10 MW

About 6.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$168/kW·mo

18.4¢ industrial · 23¢ after PUE 1.25

Per MW·year
$2M
This site · 6 MW
$12M/yr
10 kW rack
$1,679/mo
3.2¢ cheapdear 22.4¢

5.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $10M/yr less.

England industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2012
Renewable match
80%
Rack density
10 kW
Voltage
PUE
1.251.00 ideal · 1.60 typical
Power source
SSE / Scottish and Southern Electricity. Dual feeds.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

10 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

5

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Fareham, England, United Kingdom

Fareham, Hampshire

50.855°, -1.186° · Europe

Tenants / users

Enterprise, public sector, defence-adjacent

Notes

South-coast colo. Cool climate, dual London-DR path.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.