Operational
Colocation
Air cooled
Tier III

DataVault Hamilton

DataVault · Hamilton

IT live
3 MW
Free to lease
0.4 MW
$ / kW·mo
$77
White space
39k ft²

Inventory

88% occupied

Power

3 MWlive

0.4 MW to lease · 2.6 MW in use

White space

39k ft²total

2,812 ft² free · 36k ft² occupied

3,629 m² · 261 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live3 MW
Free to lease0.4 MW
Utility feed5 MW
Campus / planned4 MW

About 2 MW of the utility feed is cooling, conversion, and house load.

Power cost

$77/kW·mo

8.6¢ industrial · 10.5¢ after PUE 1.22

Per MW·year
$919k
This site · 3 MW
$2.8M/yr
6 kW rack
$460/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $1.7M/yr less.

WEL Networks · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
85%
Rack density
6 kW
Voltage
PUE
1.221.00 ideal · 1.60 typical
Power source
WEL Networks / Transpower. Dual feeds plus on-site generators.

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

6 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hamilton, Waikato, New Zealand

Hamilton, Waikato

-37.760°, 175.248° · Oceania

Tenants / users

Enterprise, Waikato, DR

Notes

Independent Waikato colo next to Datacom Kapua. Cool-climate free-air.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.