Expanding
Colocation
Liquid cooling
Tier III

DataBank PIT1 Pittsburgh

DataBank · Pittsburgh

IT live
10 MW
Free to lease
1.2 MW
$ / kW·mo
$69
White space
122k ft²

Inventory

88% occupied

Power

10 MWlive

1.2 MW to lease · 8.8 MW in use

White space

122k ft²total

8,333 ft² free · 113k ft² occupied

11k m² · 774 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.2 MW
Utility feed17.5 MW
Campus / planned14 MW

About 7.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$69/kW·mo

7.4¢ industrial · 9.5¢ after PUE 1.28

Per MW·year
$830k
This site · 10 MW
$8.3M/yr
8 kW rack
$553/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $4.7M/yr less.

Duquesne / PJM · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2015
Renewable match
35%
Rack density
8 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Duquesne Light. Dual feeds. PJM West.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

8 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Pittsburgh, Pennsylvania, United States

Pittsburgh, PA

40.441°, -79.996° · North America

Tenants / users

Enterprise, healthcare, networks

Notes

Pittsburgh DataBank. Cloudflare CNI location. PJM West.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.