Expanding
Colocation
Liquid cooling
Tier III

DataBank ATL1 Atlanta

DataBank · Atlanta

IT live
16 MW
Free to lease
1.9 MW
$ / kW·mo
$80
White space
170k ft²

Inventory

88% occupied

Power

16 MWlive

1.9 MW to lease · 14.1 MW in use

White space

170k ft²total

11k ft² free · 160k ft² occupied

16k m² · 1,013 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live16 MW
Free to lease1.9 MW
Utility feed30 MW
Campus / planned24 MW

About 14 MW of the utility feed is cooling, conversion, and house load.

Power cost

$80/kW·mo

8.6¢ industrial · 11¢ after PUE 1.28

Per MW·year
$964k
This site · 16 MW
$15M/yr
12 kW rack
$964/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.7M/yr less.

Georgia Power · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2013
Renewable match
40%
Rack density
12 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
Georgia Power. Dual feeds plus on-site diesel.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Atlanta, Georgia, United States

Atlanta, GA

33.749°, -84.388° · North America

Tenants / users

Enterprise, cloud, networks

Notes

Atlanta DataBank. Enterprise wholesale next to QTS and Equinix AT.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.