DATA4 Paris PAR03
DATA4 · Paris-Saclay / Villejust
- Planned IT
- 250 MW
- Free to lease
- 250 MW
- $ / kW·mo
- $97
- White space
- 893k ft²
Inventory
0% occupiedPower
250 MWlive
250 MW to lease · 0 MW in use
White space
893k ft²total
893k ft² free · — occupied
83k m² · 83k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$97/kW·mo
10.4¢ industrial · 13.3¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 250 MW
- $292M/yr
- 25 kW rack
- $2,429/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $202M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 95%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- RTE 225 kV / 400 kV Villejust, Chartreux and Montjay loops. Dual suppliers plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Direct-to-chip cold plates and rear-door HX. Designed for 40 kW-plus AI racks.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Nozay, Île-de-France, France
7 Route de Villejust, 91620 Nozay
48.685°, 2.235° · Europe
Tenants / users
Hyperscale, AI pipeline
Notes
Second 250 MW Paris-Saclay campus. 22 ha. Pair to PAR01. EDF nuclear PPA overlay. First halls targeted 2026-27.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.