DATA4 Paris PAR01
DATA4 · Paris-Saclay / Marcoussis
- IT live
- 95 MW
- Free to lease
- 10.4 MW
- $ / kW·mo
- $97
- White space
- 1.6M ft²
Inventory
89% occupiedPower
95 MWlive
10.4 MW to lease · 84.5 MW in use
White space
1.6M ft²total
52k ft² free · 1.5M ft² occupied
145k m² · 4,854 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 217 MW of the utility feed is cooling, conversion, and house load.
Power cost
$97/kW·mo
10.4¢ industrial · 13.3¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 95 MW
- $111M/yr
- 15 kW rack
- $1,458/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $77M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2007
- Renewable match
- 92%
- Rack density
- 15 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- RTE 225 kV / 400 kV Villejust, Chartreux and Montjay loops. Dual suppliers plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Nozay, Île-de-France, France
3 Route de Marcoussis, 91620 Nozay
48.690°, 2.241° · Europe
Tenants / users
Hyperscale, cloud, France-IX-adjacent, 70-plus carriers
Notes
Largest dedicated European campus by land. 110 ha, 23 halls, 250 MW design, 505 MW campus electrical reserve with PAR03. Villejust 225/400 kV. Complements Equinix PA and Interxion PAR already in the index.