DATA4 Milan MIL01
DATA4 · MIL01 Cornaredo

- IT live
- 87 MW
- Free to lease
- 8.7 MW
- $ / kW·mo
- $174
- White space
- 1.1M ft²
Inventory
90% occupiedPower
87 MWlive
8.7 MW to lease · 78.3 MW in use
White space
1.1M ft²total
44k ft² free · 1M ft² occupied
98k m² · 4,041 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 125 MW of the utility feed is cooling, conversion, and house load.
Power cost
$174/kW·mo
18.6¢ industrial · 23.8¢ after PUE 1.28
- Per MW·year
- $2.1M
- This site · 87 MW
- $181M/yr
- 15 kW rack
- $2,607/mo
5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $150M/yr less.
Italy industrial / Milan · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 45%
- Rack density
- 15 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- Terna 220 kV campus substation. Enel / Duereti dual feeds plus on-site diesel.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Cornaredo, Lombardy, Italy
Via Monzoro 101-105, 20007 Cornaredo MI
45.498°, 9.026° · Europe
Tenants / users
Hyperscale, cloud, MIX, 70-plus carriers
Notes
Largest dedicated digital campus in Italy. 20 ha, 170 MW design, 132 kV campus ring. Dedicated MIX and TOP-IX PoPs. Complements Equinix ML and Vantage MXP.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.