Operational
Colocation
Liquid cooling
Tier III

Data4 MAD01

Data4 · San Agustín de Guadalix

IT live
12 MW
Free to lease
1.7 MW
$ / kW·mo
$109
White space
43k ft²

Inventory

86% occupied

Power

12 MWlive

1.7 MW to lease · 10.3 MW in use

White space

43k ft²total

6,000 ft² free · 37k ft² occupied

3,982 m² · 557 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease1.7 MW
Utility feed60 MW
Campus / planned48 MW

About 48 MW of the utility feed is cooling, conversion, and house load.

Power cost

$109/kW·mo

12.2¢ industrial · 14.9¢ after PUE 1.22

Per MW·year
$1.3M
This site · 12 MW
$16M/yr
25 kW rack
$2,716/mo
3.2¢ cheapdear 22.4¢

3.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

Spain industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2026
Renewable match
90%
Rack density
25 kW
Voltage
PUE
1.221.00 ideal · 1.60 typical
Power source
Redeia. Four-building campus to 2029.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

First of four buildings live at 12 MW IT; campus 48 MW with liquid-ready AI halls.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

San Agustín de Guadalix, Madrid, Spain

San Agustín de Guadalix, Madrid

40.677°, -3.615° · Europe

Tenants / users

Hyperscale, cloud

Notes

Commissioned March 2026. Full campus expected 2029.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.