DarkNX Ontario Campus
DarkNX / Accelsius · Ontario
- Planned IT
- 300 MW
- Remaining
- 300 MW
- $ / kW·mo
- $87
- White space
- 600k ft²
Inventory
0% occupiedPower
300 MWcampus
300 MW pipeline · 0 MW in use
White space
600k ft²total
600k ft² free · — occupied
56k m² · 56k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$87/kW·mo
10.6¢ industrial · 11.9¢ after PUE 1.12
- Per MW·year
- $1M
- This site · 300 MW
- $312M/yr
- 100 kW rack
- $8,667/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $218M/yr less.
IESO industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 80%
- Rack density
- 100 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- IESO. Hydro-heavy Ontario grid. Two-phase Accelsius NeuCool campus.
Cooling
Plant
Two-phase liquid
Liquid
Deployed
Rack density
100 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Largest announced two-phase direct-to-chip (Accelsius NeuCool) campus at 300 MW.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Ontario, Ontario, Canada
Ontario, Canada
43.653°, -79.383° · North America
Tenants / users
AI cloud
Notes
Proof point for two-phase, chip-level cooling at campus scale rather than a single hall.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.